Design Slam - Implementation Subgroup

Goals of process and services team:

  • Move rules and decision making steps up-front in the process or embed in the UI supported with analytics
  • Assess up-stream and down-stream process and decision points from the "Application Acceptance"
  • Simplify the process flow and move decision flow to UI

Following the above criteria review requirements for services, rules and UI

  • Services might include: Power usage data, projected generation capacity, excess generation
  • Rules: Assist with equipment pre-purchase decisions and what-if, think about downstream contract setup
  • UI: For example embedded analytics to assist with "what-if"

Based on inputs from other subgroups we can produce a service inventory, agree UI and Rules specs.  Through collaborative modeling from Gravity Wave sequencing of services, rules and UI can be exported/imported from Gravity to BPM.

Current simplification of the model is shown below as modeled in 7.2:

New features in 7.2:
  • Service composition to combine multiple service calls into one
  • Auto generating VC forms based on process context
  • Asynchronous messaging
  • Human interaction via NetWeaver BPM by enriching PI ccBPM capability for system integration
  • Flow rules for complex rule sets
  • Reporting and analytics and email notifications
Enter labels to add to this page:
Please wait 
Looking for a label? Just start typing.